200k pond – Concrete is in.

After leaving here at 3am this morning to deliver fish to Oxford to get back before the concrete came, which was late anyway! We finally got both sides poured.

The right hand side was easy because we could pour the concrete straight into the machines bucket and then spread it all down the channel. The access to the left hand side was much more difficult…for the concrete company anyway. They had to barrow around 10 cube of concrete to complete the left side, however it was done and pretty quick too. 2 loads of concrete were poured in just under 2 hours.

There are some more holes on the back side of the pond to fill but they can be done with the mixer. We just need to wait for the concrete to go off and we can start building a single block all around.