Today was a massive day. The poly tunnel structure arrived from the manufacture, there was quite a bit of stuff which needed unloading.

The concrete is all ready and set out now, we can start getting the structure up next week. The poly tunnel was to wide to be standard so we have had to piece 2 bits of steel together to get the entire span. The tunnel should take about a week to get up and then the polythene sheeting to be fitted.

The main pond is drained and will be worked on and dug out over the weekend ready for the fitters in the next week. Cant wait to see it finally up. A quick change then off to the airport to send Koi to France…